[CCL Tunnel Works] SMRT CCL: Bartley → Paya Lebar
Автор: LTANKK
Загружено: 2026-02-13
Просмотров: 1623
Описание:
Date taken: 11/02/2026
A ride onboard a SMRT Alstom Metropolis C830 train from Bartley to Paya Lebar on the Circle Line (CCL), during the tunnel repair and strengthening work period from 17 Jan 2026 till 19 April 2026.
CCL tunnels between Paya Lebar and Mountbatten stations were closed for tunnel repair and strengthening works as the Land Transport Authority (LTA) discovered signs of tunnel "squatting" as soil conditions around the tunnels have changed. As a result, CCL services were divided into 4 segments:
1) Paya Lebar ↔ Harbourfront
2) Paya Lebar ↔ Mountbatten (Shuttle)
3) Mountbatten ↔ Dhoby Ghaut
4) Stadium ↔ Marina Bay (Shuttle; as per normal)
Filmed with iPhone 15 Pro Max.
#singapore #singaporemrt #circleline #smrtsingapore #alstom