VR36001040 Trailer Valve Assembly | Step-by-Step Technical Guide
Автор: Galipoğlu Hidromas
Загружено: 2025-06-26
Просмотров: 80
Описание:
In this video, you can learn the step-by-step installation process of the trailer valve with VR36001040 code. The process starts with the body front O-ring assembly. Then the rear O-ring on the pneumatic part is installed. The part where the shaft will work is made ready by greasing and the O-Ring in the pneumatic part is installed and greased.
The front cover O-Ring is installed and greased and then the shaft assembly is carried out. Pneumatic springs are placed and the rear cover is assembled and fixed with an in-hole circlip. The front cover is also assembled and the in-bore ring is placed. The assembly process is completed by testing the operation of the shaft with air. Finally, the process is finalised by installing plastic protection plugs.
This guide will help you to carry out trailer valve installation correctly and safely. Don't forget to subscribe to our channel for more technical information and guide videos!
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: