Create Corridor Earthwork Report - Site Design with TBC
Автор: AEC Software Technology
Загружено: 2024-11-10
Просмотров: 145
Описание: Once the subsurface is generated, the corridor earthwork report can be accessed to analyze material quantities for the road corridor. Users can select the main road, set the increment station, and define a clipping boundary to focus on a specific subsection. Calculation and display options are customizable within the report. Upon running the report, it builds surfaces and provides material quantities, which can be saved as an Excel file or printed as a PDF. The report details total bank cut, fill required, excess material, and breaks down quantities of subgrade, pavement, compaction needs, and aggregate stone base, including shoulder areas. It also provides a per-section analysis of cuts and a legend for bank, loose, and compaction volumes. This data can be combined with site grading takeoff reports to estimate total project materials. Additionally, it prepares for the next phase of the process, which involves analyzing site and corridor mass haul to strategize material movement.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: