Create Grading for Building and Additional Parking - Site Design with TBC
Автор: AEC Software Technology
Загружено: 2024-11-10
Просмотров: 214
Описание: In the process of adjusting a parking area, the speaker describes creating a new line string at an intersection by selecting the segments' intersection. They set the starting elevation by snapping to a point and proceed to grade the area, using a two percent slope in one direction and a negative two percent in the other. Perpendicular segments are used to pick up elevations and create the desired surface. The speaker then includes the parking area in the build surfaces and adds another line string to close out the section. Next, they offset the building pad by 0.1 to the inside, setting an absolute elevation of 455 for the finished floor, which flattens out the building area when surfaces are built. The surface slicer tool is used to identify and fix uneven areas. Adjustments are made to the corner of a building by setting an incoming slope of 1.5 percent and the same concept is applied to other points to maintain proper grades. Finally, the speaker mentions that in the next video, they will elevate the parking lot line work to the surface to associate it with the correct elevation for the finished surface.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: