Streambank Armoring at Pump Station
Автор: Flexamat
Загружено: 2024-11-22
Просмотров: 507
Описание:
A streambank behind a pump station is armored with Flexamat Plus 10' x 35' rolls that included extensions. The extensions consists of geogrid and the underlayment extending from the matting on the upstream side of the mat. Installation begins on the downstream end of the project. Subsequent mats are installed by overlapping the adjacent downstream mat's extensions.
Although this site had extremely tight access, the Flexamat Plus rolls were quickly installed. This streambank was armored in less than one work day.
Within the first growing season, vegetation will soon be thriving within the Flexamat Plus armor.
Flexamat.com
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: