SOUTH AUSTRALIA'S ONLY DISTRIBUTED POWER IRON ORE TRAINS HAULED BY AURIZON'S ENTIRE GWB & GWU FLEET
Автор: M&S Trains: Australian Railways
Загружено: 2026-02-27
Просмотров: 1499
Описание:
Aurizon’s fleet of six GWBs and four GWUs were kept busy throughout 2025, working iron ore trains between Wirrida and Whyalla through Australia’s remote outback. Seven return services run each week, using distributed power with two locomotives on the head end, with one to two units working on the rear depending on the train's size.
Each trip moves around 8,000 to 10,000 tonnes of product, with total train weights ranging from roughly 10,000 to 13,000 tonnes. For much of the journey, the trains traverse the Darwin and Trans Australian Railways, where the vast outback is often the only thing for 100's of kilometres in every direction.
Every GWB and GWU in Aurizon’s fleet hauled these services during 2025, and all ten units are seen in this production across multiple trips into the outback.
What you'll see:
00:00 - Introduction and train details
00:45 - Distributed Power & Locomotive Marshalling
01:25 - Quad Engine Ore Train climbs Pimba Bank
03:00 - GWA/B Class - EMD EDI/Progress Rail GT46C-ACe
03:45 - Loaded Iron Ore Train through the Valley at Woocalla
06:00 - GWU U Class - GE UGL Rail C44aci
06:35 - Quad Engine Empty returns from Whyalla
09:10 - Empty ore takes on the Outback at Tent Hill
11:40 - Triple Engine loaded Ore crosses Ballast at Heesso
13:40 - SCT Intermodal crosses Ore Train at Pimba
15:20 - Outro
Our Channel: / @ms_trains
© M&S Trains 2025 - All Rights Reserved
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: