Umahi directed CCECC to maintain the existing alignment during the period of construction
Автор: Infrastructure Revival: Nigeria's Renewed Hope
Загружено: 2023-09-21
Просмотров: 2796
Описание: Umahi directed CCECC contractor working on Outstanding Portion of Dualisation of Odukpani - Itu , Itu -IKot Ekpene road to redesign the road from flexible to rigid Pavement. Also, he directed them to ensure that the existing alignment is always maintain during the period of construction
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: