Penang Swettenham Port Expansion Progress
Автор: SCM Southern Corridor Malaysia
Загружено: 2020-10-05
Просмотров: 8524
Описание:
Overview of Penang Swettenham Port Expansion Progress, as October 2020.
Info:
Swettenham Pier Cruise Terminal (SPCT), jointly owned by Penang Port and Royal Caribbean, is undergoing expansion.
SPCT can currently accommodate one large and one smaller ship at the same time, but when the expansion is completed, it will be able to accommodate multiple Oasis class sized, plus smaller cruise ships at any one time. The first phase involves extension of the existing 400m berth and improvement of all infrastructure.
First phase cost RM150 million and construction works taking 24 to 36 months to complete. The completion of the first phase will enable the cruise terminal to handle three million passengers a year and simultaneously accommodate two mega-sized cruise ships.
Miami-based Bermello Ajamil & Partners are the design team for this project
Click “SUBSCRIBE” to follow latest video here: https://www.youtube.com/southerncorri...
Like and Follow our FB: / southerncorridormalaysia
Follow our IG: / scm_southern_corridor_malaysia
Please email SouthernCorridorMalaysia [at] gmail dot com to grant a written consent to use our video’s contents. Download to re-posting of our video contents are prohibited.
Website: http://scmlink.com.my/
Music:
Feel by LiQWYD / liqwyd
Creative Commons — Attribution 3.0 Unported — CC BY 3.0
Free Download / Stream: http://bit.ly/2CMPIwA
Music promoted by Audio Library • Feel – LiQWYD (No Copyright Music)
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: