Why This Handlebar Job Took 7.5 Hours (Full Cost Breakdown)
Автор: Mapdec Cycle Works
Загружено: 2026-02-15
Просмотров: 1617
Описание:
Why does a simple handlebar swap turn into a 7.5-hour workshop bill? Because sometimes, high-end "compatible" components simply... aren't.
In this video, we face a genuine workshop nightmare: integrating Zipp Vuka aero bars with TRP hydraulic levers and Shimano Di2 satellite shifters. On paper, this is a dream triathlon setup. In reality, the internal tolerances caused a massive compatibility clash that threatened to sever the Di2 cables.
We take you through the entire technical rescue process, including:
The "Ring of Death" Prevention: Why we leave a spacer above the stem on carbon steerers.
Carbon Fabricating: The controversial decision to file a Zipp handlebar to create a custom cable channel.
Cable Management: How to hide excess hydraulic hose without kinking or rattling.
Plus, we believe in total business transparency. Stick around for the final chapter where we provide an itemized labor breakdown, explaining exactly where every minute of that 7.5-hour invoice went.
🔧 Join the Inner Circle:
Want the uncut, deep-dive technical analysis of that Zipp modification? We discuss the specific engineering challenges and "mechanic-only" details over in our community.
👉 Join us at: Skool.com/Mapdec
💰 THE BILL: 7.5 HOURS LABOR BREAKDOWN
Here is the itemized breakdown of the actual work required for this custom integration:
1.0 Hr - Diagnosis & Leak Repair: Tracing the TRP leak, Strip down lever, replace seal, cleaning contaminated parts, test.
1.0 Hr - Brake Service & Bleed: Flushing and bleeding the full system, Clean calipers, installing new pads, and bedding them in.
1.0 Hr - Bar Fabrication: Measuring cut limits, cutting the carbon extensions, and filing the alloy insert for the Di2 cable channel, Routing hoses and cables with silencing.
1.0 Hr - Tri-Bar Extension Setup: Re-cabling and routing the extensions to match the rider's previous fit coordinates exactly with the new base bar, cut to required lengths.
1.0 Hr - Fork & Steerer Work: Dropping the fork, cutting the steerer (leaving the safety stack), sanding flush, and servicing the headset, getting the hose lengths perfect with several refits.
1.0 Hr - Internal Routing & Integration: Managing the "female-to-female" extenders, wrapping hoses to prevent rattles, and solving the Zipp/TRP pinch point.
1.0 Hr - Seatpost Customization: Modifying the battery mount aperture to fit the frame and Di2 battery securely, 2 cuts to match internal frame geometry, some sanding to adjust.
0.5 Hr - Final Check & Tune: Bolt check, gear index, test ride, and final safety inspection.
Total Project Time: 7.5 Hours
⏱️ Chapters:
00:00 The Project: Tidying a messy Tri-Cockpit
01:18 The "Measure Twice" Rule: Locking in the fit
02:40 TRP Levers & Custom Di2 Blip Integration
03:45 Cutting Carbon: Respecting the 15mm vs 30mm limits
05:12 Saving the Steerer: Why we DO NOT flush-cut stems
06:50 THE CLASH: Why Zipp Vuka & TRP don't fit
08:45 The Fix: Customizing the carbon bar (The "Void Warranty" moment?)
10:05 Final Build: Hiding hoses & silencing rattles
12:15 The Bill: A transparent breakdown of 7.5 hours labor
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: