Adelaide Tram Network 2025 Grade Separation Shutdown - A Look at CBD-Only Operations
Автор: Transport of Perth
Загружено: 2026-01-25
Просмотров: 987
Описание:
From August 2025 until January 2026, the Adelaide tram network was shut down from South Terrace to Glenelg for a level crossing removal project and road resurfacing works in Glenelg. The day this video was posted (Australia Day 2026), marks the return of the full operation of the tram network with the new overpasses, so in this video I just take a look around how the network operated during the shutdown with trams only running in the CBD, including a temporary depot at South Terrace, plus my thoughts on some changes that have happened in Adelaide since my last visit.
P.S. You cannot yet watch some other videos I mention in this video such as the Overland one I just posted this when I did as it was fitting on the day it reopened.
Chapters:
00:00 - Introduction at Victoria Square
05:27 - Temporary South Terrace Depot
10:02 - Empty Ride from South Terrace to Adelaide Railway Station
21:11 - Travelling to the Other Termini
28:40 - Random Weekday Trams Turning Around at Festival Plaza?
Filmed on: 08/12/2025 & 09/12/2025 (Final Clip).