Zojila tunnel- A mega project in J&K
Автор: Tourist &traveller
Загружено: 2018-06-13
Просмотров: 104
Описание:
Zojila tunnel project, which will provide all-weather connectivity between Srinagar, Kargil and Leh and, at 14.2 km, will also be the country’s longest road tunnel.
The tunnel will cut down the time taken to cross the Zojila pass from the 3.5 hours to 15 minutes.
It will also be Asia’s longest bi-directional tunnel and will be built at a cost of ₹6,809 crore. It is expected to be completed in five years.
The pass is situated at an altitude of 11,578 ft on the Srinagar-Kargil-Leh National Highway and remains closed during winters due to heavy snowfall, which cuts off Ladakh region from Kashmir.
The tunnel will have a transverse ventilation system, uninterrupted power supply, tunnel emergency lighting, CCTV monitoring, pedestrian cross passages at every 250 metres, as well as emergency telephones and fire-fighting cabinets at every 125 metres.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: