Day 3 of Main House Drywall
Автор: Harke Estate
Загружено: 2024-10-04
Просмотров: 72
Описание:
Day 3 of main house drywall. Sanding down the drywall plaster to be last time. Then painting it all before setting up the hot water tank stand. Placed the hot water tank stand in its final location. Then we drilled holes though the frame and marked the floor. Then we drilled holes in the concrete floor and vacuumed them out. Repositioning the hot water stand we than placed the anchors and set them in the concrete. Then we wrapped the hot water stand in drywall, plastered it and painted. Once dry we will then place our 80 gallon electric heat pump hot water tank on top. On the wall to the left of the stand we started to place unistrut supports on the wall. These will hold the copper plumbing supply lines for the cold and hot water manifold.
Amazon affiliate links for supplies:
Bosch Hammer Drill:
https://amzn.to/3BsQjpm
Craftsman Shop Vac:
https://amzn.to/47SdxBs
Ryobi Drill:
https://amzn.to/3XNampR
Edward mixer attachment:
https://amzn.to/4eO3rUt
Hyde Drywall Pallet:
https://amzn.to/3zGO2WY
Putty knife kit:
https://amzn.to/3Y5hCyK
Subscribe to watch Drs. Harke build our dream house from the ground up.
#harkeestate #housebuilder #newconstruction #houseframing #build #building #ownerbuilder
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: