Control Panel Build Series Part 15: Securing Hardware
Автор: RSP Supply
Загружено: 2018-06-13
Просмотров: 42527
Описание:
Hardware used
10-24 machine screws
Washer and Lock Washer
Line up cut hardware (wire duct, Din rail) with holes
Ensure that each location uses screw and both washer
Once Wire ducting and dinrail have been secured, start mounting electrical hardware
Power supply, Terminal blocks, network switches, etc
Make sure to put everything in the proper location.
Make sure that as you are securing hardware to the dinrail, you are making a full connection
If that hardware does not fully seat, it can come lose over time and fall off
For the PLC in this panel, it does not mount to Dinrail
It has to be directly mounted to the backplane
For that we need to layout all of the holes
Then Punch, drill and tap those holes just like the other holes on the panel.
Once everything has been secured it is important to go back and make sure everything is secured so that nothing will fall off at some point down the road or during transport.
Get the FULL video transcript here: https://www.rspsupply.com/education/a...
Check out our full line of Industrial Hardware on our website: rspsupply.com
Additional Links -
Website:
https://rspsupply.com/
Engineering Page:
https://rspsupply.com/engineering/
Panel Fabrication Page:
https://rspsupply.com/panel-fabrication/
Procurement Services Page:
https://rspsupply.com/procurement-ser...
Manufacturers Page:
https://rspsupply.com/manufacturers.aspx
Panel Fabrication Page:
https://rspsupply.com/panel-fabrication/
Panel Hardware:
https://rspsupply.com/c-34-panel-hard...
Enclosures:
https://rspsupply.com/c-1618-enclosur...
Terminal Blocks & Connectors:
https://rspsupply.com/c-1635-terminal...
Cable Wire & Assemblies:
https://rspsupply.com/c-620-cable-wir...
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: