Double Layer Drywalls | Noggin Channel Fixing for Double Layer Boarding
Автор: Gyproc India
Загружено: 2019-07-09
Просмотров: 83212
Описание:
This is how the double-layer login channel is done. Fix noggin channel perpendicular to the stance by using metal to metal screws and ensure that the noggin channel is placed behind all the horizontal joints of outer layer of bones to avoid leakage like fire and sound. Check the level of Noggin channel switch box fixing. All you need to do is put an additional noggin channel for mounting switch boxes wherever required. The spirit level should be used to check the level of noggin channel. Put ply with support for conduit support in between the Stud. Fix the switch box socket on the noggin channel. Bend flanges of each slots, past services through slots of Studs.
Checkout to know more about Drywalls : https://bit.ly/3vabm99
#doublelayerdrywall #fixingdoublelayerboarding #Doublelayerloginchannel #doublelayer #drywalls #saintgobain #gyproc
00:11 – Introduction to Noggin Channel Fixing for Double Layer Boarding
00:59 – Switch Box Fixing
2:51 – Planned Loading
04:01 – One Side Boarding
05:02 – Insulation
06:20 – Marking for Switch Box
06:58 – Cutting for Switch Box
07:10 – Other Side Boarding
07:54 – Second Layer Boarding
09:10 – Fire Stop Sealant Application
➡️ For more details on Gyproc, do visit our website: https://bit.ly/3xiLQBt
➡️ For news and information read our Blogs: https://bit.ly/3uwfi52
➡️ Subscribe to our YouTube channel: / gyprocindia and hit the 🔔 icon
➡️ Checkout our false ceiling designs on Pinterest: / gyprocindia
➡️ Like us on Facebook: / gyprocindia
➡️ Follow us on Instagram: / gyproc_india
➡️ Follow us on Twitter: / gyprocindia
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: