ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

Building A Strong Half Wall - Avoiding the WOBBLE!

diy

how to

step by step

tools

reviews

carpentry

remodel

construction

half wall

pony wall

knee wall

stiffen

wobble

reinforce

building a wall

remodeling

shower wall

glass wall

Автор: Concord Carpenter

Загружено: 2019-09-29

Просмотров: 581460

Описание: Join us on Patreon:   / concordcarpenter  
Your support helps us create detailed building and remodeling content, conduct in-depth product testing, and even lets you decide what we cover next. Together, we can keep delivering the content you love. Thank you!"


Eliminating Half Wall Wobble!
------------------------------------------
FULL ARTICLE HERE:
https://www.aconcordcarpenter.com/bes...

We typically see half walls at stair openings, replacing railings and balusters, as well as in bathrooms. In remodeling we use half walls with glass, a lot more in showers, to allow in more light.
Whether you call it a half wall, knee wall or Pony wall the issue is the same.  They tend to be wobbly and cause client complaints. No one likes a wobbly wall, cracked plaster, or cracked shower tile that results from wall movement.
What is the best way to reinforce a half wall?
Reinforcing a half wall can be accomplished easily if the floor joists run perpendicular to the half wall. In this instance, simply run a stud or two down into the joist bay and attach it to the floor framing.
This method requires that the subfloor is open from the top or the ceiling is open from below.
How May Wall Studs Should You Attach?
You can do this on every joist, or just a few. Attach each 2x4 stud to the floor joist, or to blocking between joists, with construction adhesive and 3” structural screws.
If the floor joist is running parallel to your half wall, and the wall lines up with the floor joist, you can attach ½ or ¾” plywood the half wall and run the plywood down into the joist bay and attach it to the joist.
Need More support? Add Blocking On Either Side of Stud
For additional lateral support, adding 2x solid-blocking, onto the floor joist, on either side of the 2x4 wall stud will add more stiffness, and support to the structural screws. [This is a common method in reinforcing 4x4 posts in deck framing.]
Add Blocking Between Joists
Additionally, if the joists do not run in your favor you can add 2x blocking to better position the 2x4 stud support you need. Use 2x framing and joist hangers to ensure a solid blocking connection. Sometimes installing the joist hangers “upside down,” gives you better resistance to pulling.
Using Threaded Rod to Stiffen the Half Wall
The threaded rod method works great when reinforcing a half wall, but is hard to do and super time consuming.  It requires using 1/2″ to 5/8″ threaded rod from the top wall plate down to blocking in the structural floor below.  The use of upside down joist hangers is recommended to add tensioning strength to the blocking. You can read more about this method here.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
Building A Strong Half Wall - Avoiding the WOBBLE!

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]