Design Vs Construction | Neelum Jhelum Hydropower Project | Dam Structure | Operational
Автор: Cheap Energy
Загружено: 2020-06-10
Просмотров: 12756
Описание:
#Hydropower #3DModel #Construction
The Neelum-Jhelum project is located some 100 km north-west of Islamabad in the Kashmir region. It is a high head project (420m) diverting the Neelum River through a 32.5 km long tunnel system. The underground power station output will be 969 MW corresponding to a designed maximum discharge of 280 m³/s. The project will yield an average annual energy generation of 5254 GWh. The project is the first underground hydropower project of its kind in Pakistan and is located in difficult ground conditions of up to almost 2000 m rock cover.
The project started electricity generation with commissioning of its first unit in April 2018. The project attained its maximum installed generation of 969 MW on August 14, 2018 with commissioning of its all four units.
It is worth mentioning here that Neelum Jhelum generated upto 1040 MW on April 9, 2019 beyond installed capacity of 969 MW, which reflects the efficiency of its electro-mechanical equipment, the turbines in particular. Now-a-days, the project has been running on full load i.e. 969 MW because the required quantum of water is available due to high-flow season.
________________________________________
If you found this video helpful, leave us a comment and don't forget to give us a thumbs up! 👍
________________________________________
INSTAGRAM: @HydropowerPK / hydropowerpk
FACEBOOK: / hydropowerpk
YOUTUBE: / cheapenergy
TWITTER: / cheapenergy3
FACEBOOK GROUP: / 474156706292162
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: