rate analysis for concrete floor # conglomerete floor! rate analysis for conglomerete flooring !
Автор: CIVIL4You
Загружено: 2024-05-03
Просмотров: 155
Описание:
rate analysis for floor # conglomerete floor! rate analysis for conglomerete flooring !
To prepare a rate analysis for a concrete floor with a brick blast underlayer and topping, we'll break it down into several components: materials, labor, equipment, overhead, and profit. Let's proceed step by step:
1. *Materials Cost*:
*Brick Blast Underlayer (10cm)*:
Calculate the volume of brick blast needed based on the floor area and thickness.
Determine the cost of brick blast per unit volume.
*Concrete Layer (2.5cm with ratio 1:4:8)*:
Calculate the volume of concrete needed based on the floor area and thickness.
Determine the cost of concrete mix per unit volume.
*Concrete Topping (4cm with ratio 1:24)*:
Calculate the volume of concrete needed based on the floor area and thickness.
Determine the cost of concrete mix per unit volume.
2. *Labor Cost*:
Estimate the labor hours required for each layer: brick blast underlayer, concrete layer, and concrete topping.
Determine the labor rate per hour for skilled and unskilled workers.
4. *Overhead and Profit*:
Allocate a percentage of the total cost to cover overhead expenses and profit margin.
Once we have gathered all the necessary data, we can calculate the total cost for each component and then sum them up to obtain the overall cost of the concrete floor construction. Finally, we'll divide this total cost by the total area of the floor to determine the cost per unit area.
#civilengineerdeepakkumar
#civilengineering
#floor
#floor
#quantity