In this video, we demonstrate the complete on-site process of manual boring and casting of a pile foundation. Manual piling is often used in areas with restricted access or for cost-effective small-to-medium scale projects.
What you will see in this video:
1.Setting up the tripod and manual boring rig.
2.The Boring Process: Excavating the earth manually using a soil bailer/auger.
3.Cleaning the Borehole: Ensuring the base is ready for reinforcement.
4.Lowering the Reinforcement Cage: Proper placement of the steel structure.
5.Concrete Casting: Pouring the concrete mix to complete the pile.
Technical Details:
Pile Diameter: 1 meter
Depth: 20 meter
Soil Type:Sandy Clay
Equipment Used: Manual Tripod, Winch Machine, Bailer, Excavator
If you found this video helpful, please Like, Share, and Subscribe for more civil engineering and construction site updates!
#CivilEngineering #PileFoundation #ConstructionSite #ManualBoring #FoundationWork #BuildingConstruction #SiteExecution
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: