ViaCon er stolt leverandør av Norges første SuperCor ved Brummundal, en jernbanetunnel med E6 over.
Profil SC-51 spesial
Bunnlengde 72m
Høyde 6,9m
Spenn 12,5m
Denne ble levert og montert i mai 2019.
ViaCon is a proud supplier of Norway's first SuperCor structure at Brummundal, a railway tunnel under E6 road.
Facts about the construction
Product: SuperCor
Profile: SC-51 Special
Project: E6 Arnkvern - Moelv
Contractor: Veidekke ASA
Consultant: Sweco Norge AS
Project owner: Nye Veier AS
Time of pre-assembly (appr.90% of plates): 13 days
Time of connecting sections, final assembly: 3 days
Bottom length: 72m
Span: 12,5 m
Hight: 6,9 m
ViaCon Norway pre-assembled this construction in May, ready to be completed over existing railroad in Brummundal, Norway (2hours north of OSL airport). During a 96h train-stop weekend in June, over active signal- and power lines, and under future 110 km/h 4-lane motorway the final assemble took place. 4 sections were installed and together with the bevel ends the whole assembly was completed in less than 3 days (without night time activity). The two crews from Norway and Poland worked great together and received excellent feedback from all parties involved in this project.
Learn more about our products: www.viacon.no