1-00.00 GENERAL ITEMS
2-00.00 SITE PREPARATION AND EARTHWORKS
3-00.00 ROADS
4-00.00 STORM DRAINAGE SYSTEM
5-00.00 POTABLE AND FIRE WATER DISTRIBUTION SYSTEM
6-00.00 SANITARY WASTEWATER COLLECTION SYSTEM
7-00.00 IRRIGATION DISTRIBUTION SYSTEM
8-00.00 CHILLED WATER PIPING SYSTEM
9-00.00 ELECTRICAL POWER DISTRIBUTION SYSTEM
10-00.00 AREA/STREET LIGHTING SYSTEM
11-00.00 TELECOMMUNICATION
12-00.00 INSTRUMENTATION
13-00.00 LANDSCAPING
1-00.00 GENERAL ITEMS
1-01.00 Mobilization and Demobilization*
1-01.01 Mobilization - (60%) XXX LS XXX 6,000,000.00
1-01.02 Demobilization - (40%) XXX LS XXX 4,000,000.00
1-02.00 Royal Commission Manual Camp Accommodation Costs XXX LS XXX 4,510,800.00
(Equivalent to a total number of ____________ camp man-days)
(Category III, IV and V)
1-03.00 Training of Royal Commission Operations and Maintenance Personnel 150 Mh 702.00 105,300.00
TOTAL ESTIMATED CONTRACT PRICE FOR PAY ITEM NO. 1-00.00 XXX XXX XXX 14,616,100.00
(TO BE CARRIED TO COMPOSITE SUMMARY)
Note: * The mobilization and demobilization payments shall not exceed 10% of the total prices for pay items 2-00.00 to 13-00.00
2-00.00 SITE PREPARATION AND EARTHWORKS
2-01.00 Earthworks
a. Excavation 690,322 m³ 0.000 7.000 4,832,254.00
b. Imported fill 3,238,952 m³ 0.000 11.000 35,628,472.00
2-02.00 Trial Trenches/Excavations 2,000 m 2,000.000 59.00 118,000.00
2-03.00 Demolition Works
a. Asphalt pavement and sidewalks 50,937 m² 48,171.000 12.00 611,244.00
b. Existing structure (camp/tent/transformer/tank/building/walls/TR room/site office) 24,346 m² 24,192.000 35.00 852,110.00
c. Existing wire link fence 951 m 1,075.700 35.00 33,285.00
d. Existing storm drainage 357 m 333.820 585.00 208,845.00
e. Existing road sign 34 Ea 49.000 117.00 3,978.00
f. Existing valve 18 Ea 29.000 1,170.00 21,060.00
g. Existing underground utility marker 121 Ea 121.000 117.00 14,157.00
h. Existing flange 5 Ea 5.000 585.00 2,925.00
i. Existing manhole 61 Ea 79.000 5,850.00 356,850.00
j. Existing fire hydrant 6 Ea 8.000 1,170.00 7,020.00
k. Existing water pump 3 Ea 2.000 2,340.00 7,020.00
l. Existing light pole 46 Ea 214.000 2,340.00 107,640.00
m. Existing guard post 5 Ea 5.000 585.00 2,925.00
n. Existing tower 1 Ea 1.000 292,500.00 292,500.00
o. Existing gate 3 Ea 3.000 2,340.00 7,020.00
p. Existing drop inlet 5 Ea 12.000 1,755.00 8,775.00
q. Existing substation structure for cathodic protection system
q.1 Perimeter wall 10.000 Ea 3,638.00 36,380.00
q.2 Steel gate (dismantling) 1.000 Ea 1,170.00 1,170.00
q.3 Equipment foundation 3.000 Ea 2,925.00 8,775.00
2-04.00 Removal of Existing Trees 2,482 Ea 1,102.000 293.00 727,226.00
2-05.00 Sleeves and Ducts
a. FRP pipe sleeves
a.1 250 mm diameter, 10,000 STIS 1,563 m 1,563.000 255.00 398,565.00
a.2 700 mm diameter, 5,000 STIS 2,100 m 2,100.000 607.00 1,274,700.00
a.3 1,100 mm diameter, 5,000 STIS 2,100 m 2,100.000 1,150.00 2,415,000.00
b. Reinforced concrete encased duct bank
b.1 1.14 m x 0.90 m with 4 nos. each of 160 mm and 50 mm diameter uPVC duct 2,100 m 2,100.000 811.00 1,703,100.00
b. Relocation works
b.1 Existing SEC Substation 1 EA 58,500.00 58,500.00
Existing transformer/rectifier inset 1 EA 58,500.00 58,500.00