ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

HEATHROW AIRPORT TERMINAL 5 | A PROJECT MANAGEMENT CASE STUDY

Автор: Project Parthenon

Загружено: 2022-10-09

Просмотров: 5800

Описание: What is the measure of success for Heathrow airport? Is it the passengers' satisfaction with their experience, or is it something else? It is now clear that, despite BAA's tagline : “Making Every Journey Better ” and although 65 million passengers pass every year through the world's busiest international airport, passengers were not a key stakeholder in the conceptualization and management of Heathrow airport Terminal 5. From a business point of view, passengers are the airlines' customers and BAA Ltd. rather sees them as enablers of business. One of the big differences between Heathrow Terminal 5 and Beijing Terminal 3 is that the latter focused on the experience that millions of visitors would experience coming to China in 2008 for the Olympics whilst the former is privately-owned and their focus is not on the passengers' experience, but rather on renting commercial space.
The measure of success for Terminal 5 is not passenger enjoyment or technical efficiency, it is the revenue generated by passengers spending money in the shops. So the focus of the Terminal 5 project was on opening the restaurants and shops on time in order to generate rent revenue, rather than delaying the opening in order to resolve luggage handling issues. One could question the wisdom of this short-term revenue-driven approach, as I now know many people that will not fly BA in order to avoid Terminal 5. The House of Commons Transport Committee report specifically blamed BA and BAA for the chaos at Terminal 5 and stated that the event in March was a source of “national embarrassment” (HCTC, 2008, p.3). In sum, although the physical project was delivered on time and budget, the program is a failure from a PR and passenger point of view.
Heathrow Airport Terminal 5 – Successful project, failed program
On opening day, which was 28th March 2008, the baggage handling ‘system' failed and almost 300 flights in and out of Heathrow Airport were cancelled during the first five days, affecting 36,584 passengers. On 30 March 2008, Jonathan Russell (2008) wrote in The Telegraph: “Never mind that delivery of the £4.3bn building, the largest single-span structure in Europe, was on time and to budget; in the public eye it will always be associated with the chaos of cancelled flights and lost luggage.” 
So, what had happened? Though as per the project success measures. Heathrow Airport T5 Project was completed on Time, on Budget & as per the Scope.
Welcome everyone today we're going to fly out to Heathrow Airport in London England to talk about the terminal 5 and what happened on its opening day...

So, why build a new terminal in the first place well British Airways had three primary needs:
⦁ they wanted to maintain their ranking as the number one airport in Europe
⦁ they wanted to improve scalability as air travel is expected to double by 2027
⦁ and they wanted to take advantage of economies of scale

Project History:
Planning, designing, constructing, and preparing Terminal 5 was an enormous and risky undertaking that spanned 26 years. Both British Airways (the national airline of the United Kingdom) and BAA (the organization responsible for operating Heathrow Airport) played a primary role in the project. But despite the size of the project and its inherent risks, the parties involved were able to deliver it on-time and on-budget.

Vision and Objectives:
The vision of the project was to transform Heathrow into the world’s greatest airport. British Airways aimed to move all of their operations under a newly constructed Terminal 5 to lower costs and improve the customer experience via economies of scale. As air travel was expected to double by 2027, British Airways expected to increase passenger capacity from 55 million to 90 million per year, while handling approximately 12,000 bags per hour.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
HEATHROW AIRPORT TERMINAL 5 | A PROJECT MANAGEMENT CASE STUDY

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Agile Management | Google Project Management Certificate

Agile Management | Google Project Management Certificate

WHY GERMANY IS SO GOOD IN LOGISTICS: Landing, unloading, loading – Cargo hub Leipzig | Documentary

WHY GERMANY IS SO GOOD IN LOGISTICS: Landing, unloading, loading – Cargo hub Leipzig | Documentary

Heathrow Terminal 5 Opening Day Disaster - Lessons Learned | Techcanvass

Heathrow Terminal 5 Opening Day Disaster - Lessons Learned | Techcanvass

Heathrow Terminal 5 Failure (SFU students case study)

Heathrow Terminal 5 Failure (SFU students case study)

2019 Wagner Prize Finalist:  London Heathrow Airport Uses Real-Time Analytics

2019 Wagner Prize Finalist: London Heathrow Airport Uses Real-Time Analytics

Heathrow: Britain's Busiest Airport - S4 E1 | Our Stories

Heathrow: Britain's Busiest Airport - S4 E1 | Our Stories

Аэропорт Манчестера потратил 1,3 миллиарда фунтов стерлингов, чтобы сделать ваши поездки медленнее.

Аэропорт Манчестера потратил 1,3 миллиарда фунтов стерлингов, чтобы сделать ваши поездки медленнее.

How Company Culture Affects Project Management | Google Project Management Certificate

How Company Culture Affects Project Management | Google Project Management Certificate

HS2: The £100BN Railway Dividing a Nation

HS2: The £100BN Railway Dividing a Nation

A Case Study about Project Management Technique - the MBS Rebuild Project

A Case Study about Project Management Technique - the MBS Rebuild Project

Гарантий США нет — Зеленский идёт на отчаянный шаг /№1093/ Юрий Швец

Гарантий США нет — Зеленский идёт на отчаянный шаг /№1093/ Юрий Швец

Heathrow Terminal 5 - Success or Failure?

Heathrow Terminal 5 - Success or Failure?

Пример неудачного управления проектами | Почему проекты терпят неудачу? Проект McDonald's Arch De...

Пример неудачного управления проектами | Почему проекты терпят неудачу? Проект McDonald's Arch De...

Brisbane's new runway - a documentary

Brisbane's new runway - a documentary

TITANIC Movie is a Failed Project | A Case Study by PRITESHKUMAR PATIL

TITANIC Movie is a Failed Project | A Case Study by PRITESHKUMAR PATIL

Inside the World’s Longest Flight: Secrets of the A380 from London to Sydney | Full Documentary

Inside the World’s Longest Flight: Secrets of the A380 from London to Sydney | Full Documentary

Управление проектами: пример из практики и упражнение.

Управление проектами: пример из практики и упражнение.

Risk Management Tutorial | Project Management  | Invensis Learning

Risk Management Tutorial | Project Management | Invensis Learning

All the PMP and CAPM Formulas - One Video - Downloadable Formula Sheet

All the PMP and CAPM Formulas - One Video - Downloadable Formula Sheet

Burj Khalifa | The Project Management Case Study

Burj Khalifa | The Project Management Case Study

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]