ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

sleeper density in railway engineering || sleeper density problems 🔥🔥🔥

Автор: Civil Notebook

Загружено: 2022-06-23

Просмотров: 10009

Описание: Hi
I am Rahul Welcome to my youtube channel Civil Notebook.
About this video-
Dosto is video me app logo ko batayunga sleeper density in railway engineering ke bare me.
Ummeed Hai Aapko Ye Video Bahut Pasand Aayegi.
Sleeper density is the number of sleepers per rail length.

It is specified as M+x, where M is the length of the rail in metres and x is a number that varies according to factors such as:

(a) axle load and speed
(b) nature of formation
(c) type and strength of the sleepers
(d) type and section of rails
(e) type of ballast and ballast cushion

Sleeper density normally varies from M+3 to M+7 in india
What is a Railway Sleeper?
Railway sleepers are the components on which the rails are arranged with proper gauge. These sleepers generally rests on ballast and is also called as ties in some regions. The load from rails when train passes, is taken by these sleepers and is distributed it to the ballast.
Functions of Railway Sleepers :
hold the rails strongly and to maintain uniform gauge.
transfer the load from rails to the ballast or ground.
reduce the vibrations coming from rails.
offer longitudinal and lateral stability.
Classification of Railway Sleepers :
Wooden sleepers
Concrete sleepers
Steel sleepers
Cast iron sleepers
Composite sleepers

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
sleeper density in railway engineering || sleeper density problems 🔥🔥🔥

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Железнодорожный #компенсатор стрелочного перевода | #Рельс с язычком | #Проверочный рельс | работ...

Железнодорожный #компенсатор стрелочного перевода | #Рельс с язычком | #Проверочный рельс | работ...

Компоненты железнодорожного пути | #Шпала | #Балласт | #Стык | #Система скрепления | #Накладка с ...

Компоненты железнодорожного пути | #Шпала | #Балласт | #Стык | #Система скрепления | #Накладка с ...

#Turnout Design of a #railway turnout. #Coles Method and #Indian Railways Method, with all details.

#Turnout Design of a #railway turnout. #Coles Method and #Indian Railways Method, with all details.

Как читать таблицу уровней и уклонов рельсов железнодорожного пути

Как читать таблицу уровней и уклонов рельсов железнодорожного пути

Size of Railway Sleeper and Ballast/Function of Sleeper/Function of Ballast/Rail Length/fish plate

Size of Railway Sleeper and Ballast/Function of Sleeper/Function of Ballast/Rail Length/fish plate

Railway crossing| 3way lapped crossing.

Railway crossing| 3way lapped crossing.

Секреты пакистанской мастерской — процесс изготовления блоков и цилиндров двигателя @Pakistani-Hands

Секреты пакистанской мастерской — процесс изготовления блоков и цилиндров двигателя @Pakistani-Hands

Turnout In Railway Track | Hindi | Railway Engineering |

Turnout In Railway Track | Hindi | Railway Engineering |

Components Of A Railway Track||Rail, Sleeper, Ballast, Rail Fastening and Fixtures Formation Level||

Components Of A Railway Track||Rail, Sleeper, Ballast, Rail Fastening and Fixtures Formation Level||

RBT / Rails / Compositions / Types of Rails / Double Headed / Bull Headed / Flat Footed/ lecture - 6

RBT / Rails / Compositions / Types of Rails / Double Headed / Bull Headed / Flat Footed/ lecture - 6

cross section of railway track || cross section of railway embankment 🔥🔥

cross section of railway track || cross section of railway embankment 🔥🔥

Quantity Of ballast for Railway Track | Depth Of Ballast | Spacing of Sleeper | Quantity Of Ballast|

Quantity Of ballast for Railway Track | Depth Of Ballast | Spacing of Sleeper | Quantity Of Ballast|

Cant or Superelevation On Curves In Railway Tracks | Hindi | Railway Engineering |

Cant or Superelevation On Curves In Railway Tracks | Hindi | Railway Engineering |

Through packing in rail track//sleepers packing//8 steps of packing..//Rly. Engg.dept.work..🚅🚄🚝🚆

Through packing in rail track//sleepers packing//8 steps of packing..//Rly. Engg.dept.work..🚅🚄🚝🚆

Curve | गोलाई | curve versine, superelevation, transition, radius and degree measurement

Curve | गोलाई | curve versine, superelevation, transition, radius and degree measurement

RBT / Rail Sleepers / Function & Types of sleeper / Requirements of Ideal sleepers / lec. 9

RBT / Rail Sleepers / Function & Types of sleeper / Requirements of Ideal sleepers / lec. 9

How to do Rail Fastening and its Components | Elastic Rail fastening and Fixtures

How to do Rail Fastening and its Components | Elastic Rail fastening and Fixtures

TWS Point in Railway || tws Instalation Fault, adjustment #signals #pway   @kumarsir2612

TWS Point in Railway || tws Instalation Fault, adjustment #signals #pway @kumarsir2612

Glued joint ! what is glued joint ! Glued joint in railway

Glued joint ! what is glued joint ! Glued joint in railway

Construction of Railway Track  - Railway Engineering - Transportation Engineering 2

Construction of Railway Track - Railway Engineering - Transportation Engineering 2

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]