IBR Related Risk General Session
Автор: WECC
Загружено: 2025-10-15
Просмотров: 51
Описание:
The rapid interconnection of IBRs, both Bulk Electric System (BES) and non-BES, is the primary driver of grid transformation and poses
a high risk to BPS reliability. The pace of this change continues to challenge grid planners, operators, protection engineers, and many
other facets of the electricity sector. This session focused on IBR registration, Reliability Standards, and other related topics.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: