Ultra-Track Pan Installation Video
Автор: UltraTech International, Inc.
Загружено: 2022-08-22
Просмотров: 1665
Описание:
This animated video gives an overview of the installation process for Ultra-Track Pans, Composite Model.
The composite model Ultra-Track Pans have been designed to provide railroad spill containment at industrial rail sidings and locomotive maintenance facilities. The twenty-foot-long pans can be connected and used for spill control for everything from small drips during maintenance to catastrophic spills from tanker cars.
Product Highlights
Easy installation - minimal site preparation (no excavation) required.
Constructed with high strength, non-porous, corrosion-resistant fiberglass for years of reliable service.
Low-profile: 20' long x 4-7/8" high.
Pandrol compatible.
Railside gasket sealing system – prevents spills from leaking between track pans and rails.
Optional flow-through technology increases containment capacity for larger spills while minimizing cleanup of smaller spills.
Optional drainage manifold allows center and side pans to drain to oil/water separators, holding ponds, etc.
Drainage manifold comes with clean out port to allow for removal of sludge blockages, etc. Installation requires minimal ballast removal.
-Optional polyethylene (LLDPE) grating package available for safer foot traffic.
Visit www.trackpans.com or call us at 904-292-1611 for more information.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: