ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

University of New Hampshire Water Treatment Plant Design-Build Project

Автор: Woodard & Curran

Загружено: 2022-02-17

Просмотров: 406

Описание: The University of New Hampshire (UNH) owns and is responsible for operations of a water treatment plant (WTP) that serves the entire campus as well as the Town of Durham, NH. The University replaced the aging facility with an efficient, state-of-the-art, 26,000-square-foot WTP designed to treat and deliver up to two million gallons of high-quality drinking water per day.

The new plant, delivered under a collaborative design-build contract, is the first of its kind in New Hampshire and features a unique treatment process designed to accommodate three very different source waters, as well as a significant population flux. UNH has upwards of 13,000 undergraduate students on campus between September and May, adding to Durham’s year-round population of approximately 16,500.

The new WTP sits adjacent to College Woods, a 250-acre area of woods, streams, and fields used by UNH and area residents for recreation and research. The design team took care in situating the facility to minimally impact the natural resources. While the new plant required some trees to be cut, the team coordinated with the University’s facilities staff to properly balance protection of existing trees with space requirements for the new WTP. While the plant’s design had to maintain the same treatment capacity, the new facility was designed to have full redundancy of all equipment and provide enough space to facilitate maintenance and operations for the foreseeable future. Woodard & Curran designed the new treatment building with a capacity of 2.0 million gallons per day (MGD). The facility is equipped with three residuals lagoons, an open process area that is visible through interior windows, and a training lab for engineering students to perform experiments. Unlike the old facility, the new plant site is located above the 100-year flood plain and will better handle the varied range of water characteristics from the three water sources.

The new treatment process includes rapid mix, flocculation, plate-settler clarification, multi-media filtration, and disinfection. Additionally, there is corrosion control, pH adjustment, and fluoridation. There is also a supplemental chemical feed system and multiple dosing points for seasonal manganese treatment using potassium permanganate. Below grade, concrete tanks include two backwash supply tanks from which water is pumped for filter backwashing operations, two disinfection contact time tanks and three independent clearwells, all of which provides significant redundancy in the overall treatment process.

The design-build approach allowed for stakeholder input throughout the project. The campus planning department reviewed iterations of conceptual designs, constructability reviews were conducted by the general contractor and operability reviews were performed by both Woodard & Curran’s operations group and existing UNH WTP operations staff. Throughout the entire project, this process was fully transparent with close collaboration between the University, owner’s project manager, and design-build team. The project was expedited by the alternative delivery method with construction starting as final design details were finalized, which also reduced the amount of time the old facility needed to remain operational.

As construction neared completion, UNH elected to engage a contract operator for the new facility. After an additional procurement stage, the project effectively turned from a design-build delivery into a design-build-operate contract with Woodard & Curran’s operations and management team assuming the contract. The existing relationship allowed for an easy transition of operations staff under the Woodard & Curran umbrella from the old facility to the new facility, which began distributing reliable, high quality water in March 2020.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
University of New Hampshire Water Treatment Plant Design-Build Project

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Wastewater Treatment Plant Virtual Tour

Wastewater Treatment Plant Virtual Tour

Почему железным дорогам не нужны деформационные швы

Почему железным дорогам не нужны деформационные швы

Египет Разделяет Сахару, Чтобы Впустить Внутрь Средиземное Море. Это Изменит Карту Африки Навсегда!

Египет Разделяет Сахару, Чтобы Впустить Внутрь Средиземное Море. Это Изменит Карту Африки Навсегда!

Как хранят миллиарды кубометров газа под землёй? Технология ПХГ простыми словами

Как хранят миллиарды кубометров газа под землёй? Технология ПХГ простыми словами

UNH Design-Build Water Treatment Facility

UNH Design-Build Water Treatment Facility

Как Амстердам изобрел капитализм

Как Амстердам изобрел капитализм

March 2023 Ivory Coast Water Treatment Plant Construction

March 2023 Ivory Coast Water Treatment Plant Construction

Как работает АВТОБЕТОНОНАСОС?

Как работает АВТОБЕТОНОНАСОС?

Может ли выжить машиностроение в России?

Может ли выжить машиностроение в России?

Почему опреснение воды так сложно?

Почему опреснение воды так сложно?

Закон Бернулли

Закон Бернулли

Как работает очистка городской воды: питьевая и сточная вода

Как работает очистка городской воды: питьевая и сточная вода

Проблема с ветроэнергетикой

Проблема с ветроэнергетикой

Видеотур по очистным сооружениям острова Пирс, Портсмут, штат Нью-Гэмпшир

Видеотур по очистным сооружениям острова Пирс, Портсмут, штат Нью-Гэмпшир

Визуализация гравитации

Визуализация гравитации

Operationalizing Sustainability: No Trivial Pursuit

Operationalizing Sustainability: No Trivial Pursuit

Wastewater Treatment Plant Construction Tour | May 2024

Wastewater Treatment Plant Construction Tour | May 2024

$12 Миллиардов, Но Бесплатно Для Всех. Что Скрывает GPS?

$12 Миллиардов, Но Бесплатно Для Всех. Что Скрывает GPS?

Как на самом деле работают скважины и водоносные горизонты

Как на самом деле работают скважины и водоносные горизонты

Forest Drought Research

Forest Drought Research

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]