ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

The Biggest Power House? NHPC Uri Power Project ll:

travel

travel vlog

traveling wilburys

travelin soldier dixie chicks

travel tips

travel songs

travel love music

travelin soldier

travel music

traveling spirit sky

traveling trader

traveling robert

travel blog

vloging

vlogging camera

vlogging through history

vlogging

vloggingblonde

vlogging tips

vlogging setup

vlogging with cj_on_32s

vlogging music

vlogging camera for beginners

blogging my passion

vlogging with angie n kidz

vlogging tips for beginners

Автор: MZR Kashmir

Загружено: 2023-06-03

Просмотров: 9595

Описание: The Uri-II hydroelectric plant is the second run-of-the-river power project on the Jhelum River in the Uri area of Baramullah District, Jammu and Kashmir,

Uri-II power station is run-of-the-river scheme with an installed capacity of 240 MW (4 X 60 MW) to harnesses the Hydropower potential of river Jhelum (a tributary of Indus river). The Power Station was commissioned in year the 2013-14.
he Uri-II hydroelectric plant is the second run-of-the-river power project on the Jhelum River in the Uri area of Baramullah District, Jammu and Kashmir, India. The state-owned National Hydro Power Corporation (NHPC) developed the project downstream of the existing 480MW Uri-I power plant, which was commissioned in 1997.‪@MZRKashmir‬

The 240MW Uri-II power plant consists of four 60MW generating units. Three of the four units were commissioned by the end of 2013 and the plant began commercial operations in March 2014. The project was formally inaugurated in July 2014.

The hydroelectric project is located near the border of India and Pakistan. Pakistan objected to the construction of the controversial Indian power plant, alleging the violation of the Indus Water Treaty signed between the two countries in 1960. The treaty allows the three rivers Indus, Jhelum, and Chenab, to flow into Pakistan. India’s Intelligence Bureau (IB) warned of a possible terrorist attack at the project site.

Uri-II project details
The Uri-II hydroelectric project consists of a 52m-tall and 157m-long concrete gravity dam with four 9m wide spillways, a 4.23km long headrace tunnel with 8.4m diameter, a restricted orifice type surge shaft of 25m diameter, two 5m diameter steel-lined penstocks, four 3.5m diameter bifurcated steel-lined penstocks, an underground powerhouse, and a horseshoe-shaped tailrace tunnel 3.61km in length.

“The Uri-II hydroelectric project is designed to generate 1,123.76 million units of electricity annually.”
The project was designed to use Jhelum waters at a gross head of about 130m, following the discharge of Uri-I tail water upstream.

The powerhouse cavern of the plant is 133m-long, 15m-wide, and 40m-high. The powerhouse accommodates four Francis vertical turbines of 60MW capacity each. The plant is designed for a maximum water flow of 225cubic metres a second.

Construction of the Uri-II power project
Construction of the hydroelectric power project started in 2005. The construction work, however, suffered significant delay due to an earthquake and frequent flooding of River Jhelum. The construction required a total cost of Rs22.9bn ($350m).

Construction of the 337m-long diversion tunnel of 8.8m diameter to channelise the river for facilitating the dam construction was completed by the beginning of 2007. The dam structure, involving 100,000 cubic metres of concrete, was completed in March 2011. Construction of the powerhouse and switchyard, as well as key tunnelling works, was carried out thereafter.

Rock support methods, involving wire mesh, shotcrete, steel rib, rock bolt, and rock anchor, were used for the tunnelling work in adverse geological conditions.

The power project construction involved 1.92 million cubic metres of excavation, including 670,000 cubic metres of rock excavation and 980,000 cubic metres of underground excavation.

Uri-II power transmission
The electricity generated from the Uri-II plant is evacuated at 400kV and fed into India’s Northern grid via the 114km-long Uri-II-Uri-I Inter-connector transmission line and the Uri-II-Wagoora transmission line.

The Uri-II hydroelectric project is designed to generate 1,123.76 million units of electricity annually. The power output of the plant is supplied to the states of Jammu and Kashmir, Haryana, Himachal Pradesh, Uttarakhand, Uttar Pradesh, Haryana, Delhi, Punjab, Rajasthan, and Chandigarh.

Contractors involved with the Uri-II hydroelectric project
Hindustan Construction Company (HCC), an Indian infrastructure company, was awarded the civil works contract for the Uri-II power plant construction in 2005. The contract involved the construction of dam, surge, and pressure shafts, headrace and tailrace tunnels, and the underground powerhouse.






Click to Join Us Facebook:
  / mzrkashmir  
Click to Join Us instagram:
  / mzr_kashmir  
Join this channel to get access to perks:
   / @mzrkashmir  

#kashmir #trekkinginkashmir #mzrphotography #outdoor #photography #youtube #youtuber #instagram #music #love #follow #like #tiktok #spotify #youtubers #video #youtubechannel #explorepage #memes #gaming #instagood #twitch #subscribe #facebook #hiphop #gamer #viral #art #rap #explore #k #ps #likeforlikes #followforfollowback #bhfyp #soundcloud #meme #fortnite #photography #bhfyp #funny #newmusic #trending #m #s #likes #a #rapper #twitter #fashion #f #xbox #itunes #vlog #game #producer #podcast #live #repost #o #applemusic #trap #sub #followme #life

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
The Biggest Power House? NHPC Uri  Power Project ll:

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Японец по цене ВАЗа! Оживляем пацанскую мечту :)

Японец по цене ВАЗа! Оживляем пацанскую мечту :)

“Патриоты” не летят, а гражданство США — отбирают: Вашингтон начинает чистку /№971/ Юрий Швец

“Патриоты” не летят, а гражданство США — отбирают: Вашингтон начинает чистку /№971/ Юрий Швец

Power House Kitna bada hai  (Kishtwar mai)

Power House Kitna bada hai (Kishtwar mai)

Uri power project || exploring uri dam baramulla || ‎@Tariq1232 

Uri power project || exploring uri dam baramulla || ‎@Tariq1232 

Construction Progress on Dasu Hydropower Project WAPDA Kohistan upper

Construction Progress on Dasu Hydropower Project WAPDA Kohistan upper

Я Добыл Самое Сильное Оружие в Майнкрафте

Я Добыл Самое Сильное Оружие в Майнкрафте

Ликвидация главы ФСБ? / Спецоперация спецслужб

Ликвидация главы ФСБ? / Спецоперация спецслужб

10 Technologies That Will Change The World

10 Technologies That Will Change The World

Серия Мощных Взрывов В Житомире И Полтаве💥🔥 Часов Яр Вот-Вот Падет💣☠️ Военные Сводки За 03.07.2025

Серия Мощных Взрывов В Житомире И Полтаве💥🔥 Часов Яр Вот-Вот Падет💣☠️ Военные Сводки За 03.07.2025

⚓️Drukte op het Hoendiep⚓️

⚓️Drukte op het Hoendiep⚓️

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]