This Is How You Install Heat Pumps in a Flood Zone (Dual 4-Ton ACiQ)
Автор: Mikey Pipes - Pipe Doctor Plumbing & Heating & Air
Загружено: 2026-03-03
Просмотров: 2244
Описание:
Two beautiful 4-ton units going up on the outside wall ABOVE flood level in Woodmere, Long Island NY — because when you’re in an AE flood zone, elevation isn’t optional… it’s survival.
In today’s uncut install footage, we’re hanging two 4-ton Mikey Pipes powered by ACiQ side-discharge communicating inverter heat pump outdoor units, then jumping into the attic to start the air handler + ductwork side of the job. We also talk real-world install problems (cold-weather stickers that don’t stick 🤦♂️), hydronic coil integration, duct routing, and how we keep installs clean and serviceable.
This video is for service technicians who want to see:
✅ Wall-mount spacing + leveling
✅ Outdoor unit placement strategy (flood zone, clearance, access)
✅ Attic air handler layout + plenum planning
✅ Ductwork details that actually matter
📍 Long Island HVAC / Heat Pump Installation (Woodmere, NY)
If you’re in Nassau County (or anywhere on Long Island) and want whisper-quiet, high-efficiency heating & cooling with a clean install — call my office.
Pipe Doctor Home Services, Inc.
📞 516-348-6300
🌐 pipedoc.net
🔥 Become an ACiQ Dealer (signup link)
https://aciq.com/mikeypipes
✅ Limited Edition 2025 Mikey Pipes Poster — $42.50 DELIVERED (100% to charity)
Autographed Limited Edition 2025 Poster (v2.0) — $42.50 shipped (includes stickers, pen, card & magnet).
100% of proceeds go to Mikey Pipes Philanthropy (charity).
Payment options:
PayPal: [email protected]
Zelle: [email protected]
Venmo: @PipeDoctor
CashApp: $mikeypipesny
🎯 If you got value from this install footage: smash the Like, subscribe, and drop a comment:
Do you wall-mount in flood zones, or do you prefer pads + risers — and why?
Part 2 Teaser:
Line sets, drains, commissioning… and yes — we’re fixing the sticker situation. 😤
Chapters
00:00 Intro — dual 4-ton ACiQ side-discharge install (Woodmere, NY)
01:05 Wall-mount layout + spacing (centers measurement)
03:10 Leveling + fastening the brackets
05:05 Unboxing / staging to lift safely
07:10 First unit goes up (guide bolts + lock-in)
10:05 Both outdoor units mounted ABOVE flood level (beauty shot)
11:35 Sticker problem in the cold + QC shout-outs
13:10 Attic: old units decommission + new air handler positioning
16:05 Plenums, filter cabinet, wiring cleanup
18:30 Hydronic coil talk + oversizing reality (what actually works)
21:10 Ductwork routing, oval-to-round, insulation details
26:40 Return box build + cutting in returns
30:10 Rain delay + line set plan (next visit)
32:20 Wrap-up: efficiency, warranties, call-to-action + Part 2
Hashtags
#LongIslandHVAC #HeatPumpInstallation #ACiQ
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: