The MeyGen Tidal Array - The AR1500 Tidal Turbine
Автор: Ampeak Energy
Загружено: 2019-06-18
Просмотров: 2548
Описание:
The first phase of the MeyGen project (Phase 1A) involves the deployment of 4 No. 1.5MW turbines installed on gravity turbine support structures as part of MeyGen’s “deploy and monitor strategy” and will act as a precursor to the development of the remaining consented 86MW project.
Each turbine is located on an individual foundation weighing between 250 and 350 tonnes, coupled with 6 ballast blocks weighing 1,200 tonnes, that provide horizontal stability over the lifetime of the turbine. Each turbine has a dedicated subsea array cable laid directly on the seabed and brought ashore via a horizontal directionally drilled borehole within the foreshore bedrock.
The turbines feed into the onshore power conversion unit building at the Ness of Quoys, where the low voltage supply will be converted to 33kV for export via the 14.9MW grid connection into the local distribution network. On completion, this phase of the tidal array will generate sufficient electricity to supply 2,600 homes.
Find out more here: https://simecatlantis.com/projects/me...