TBC Utility Module - Create Waterline Introduction
Автор: AEC Software Technology
Загружено: 2024-11-27
Просмотров: 148
Описание: In this chapter, the focus is on creating a pressurized water line system. The process begins with downloading a project VCE file and a PDF document, which includes a typical road cross-section on page four. The goal is to model the subgrade of the project by grading it to subgrade, then installing a trench for the water line, ensuring it is the correct distance below the finished design. The project features a road corridor for Ridge Berry Road, with both the finished design top surface and the subgrade modeled, extending a foot and a half behind the back of the curb. This provides sufficient surface area for the water line, which will be positioned about four feet below the finished design. The trenching will reach the subgrade, the prepped surface area, to facilitate the installation. The chapter guides through simulating the modeling of the water line, determining the trench, and calculating the material volumes needed for installation. The initial step involves downloading the necessary content, followed by data preparation.
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: