Digital Twin Road Construction: 50% Faster Design, 30% Cost Savings | JKRS Sarawak
Автор: Bentley OpenRoads
Загружено: 2026-02-20
Просмотров: 39
Описание:
What does it take to build a 335 km road through one of Malaysia's most remote and geographically challenging regions — on time and on budget? For Jabatan Kerja Raya Sarawak (JKRS), the answer was a digital twin.
Working with Bentley software including OpenRoads Designer, SYNCHRO 4D, ProjectWise, and iTwin Capture, JKRS transformed how they designed, coordinated, and delivered the Sarawak Sabah Link Road Phase 2 — cutting design time by 50%, reducing costs by 30%, and minimizing environmental impact by 80%.
This project now sets the benchmark for infrastructure delivery across Malaysia.
🏆 Recognized as a 2025 Bentley Year in Infrastructure (YII) Award Winner.
🔗 Full project story: https://blog.bentley.com/software/yii...
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: