"They're really tearing down that launch mount" | SpaceX Starbase
Автор: NASASpaceflight
Загружено: 2025-11-16
Просмотров: 78623
Описание:
The teardown of Pad 1 at Starbase is picking up pace as Pad 2 nears readiness to host initial testing of Booster 18 ahead of next year's Flight 12. That flight will mark the first flight of the Block 3 Starship, which SpaceX is producing en masse in the Starfactory.
⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
Narration by John "Das" Galloway.
🎥 Video from Ceaser G, Colleen, Gage, and Starbase Live.
✂️ Edited by Thomas Hayden (@_thomashayden).
🔍 If you are interested in using footage from this video, please review our content use policy: https://www.nasaspaceflight.com/conte...
L2 Boca Chica (more clips and photos) from BC's very early days to today.
🔗 https://forum.nasaspaceflight.com/ind...
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)
#SpaceX #StarbaseUpdate #SpaceNews #SpaceExploration #RocketLaunch #Starship #BoosterTesting #SpaceTechnology #SpaceXUpdates #SpaceXLaunch #SpaceXStarbase #SpaceXNews #SpaceXUpdates2025 #StarbaseLaunchSite #StarshipModifications #SpaceXLaunchPad #SpaceXTesting #SpaceXProductionSite #SpaceXBoosterTesting #SpaceXLaunchUpdates #SpaceXSpacecraft #spacexdevelopment
Timestamps:
0:00 Ship Cryo Stand Moved to Prod Site
0:30 Cable Chain Removed From Tower 1
0:48 OLM Section Cut Away
1:14 LOX BQD Back Cover Installed
1:30 Tank Arrives From McGregor
1:39 Excavator Operator Warming Up
1:54 Another OLM Section Cut Away
2:05 ibeproofin’ Rotated
2:13 Work on Booster 17
2:44 Giga Bay Part Lifted
2:59 Pad 2 Deluge Test
3:32 Deluge Depress Venting
3:50 Orbital Pad 1
4:09 Sunset Behind the Production Site
4:18 B18.3 Cryo Testing
4:31 CH4 BQD Back Cover Installed
4:57 Orbital Pad 1
5:28 Nitrogen Delivery
5:57 Sunrise Over the Gulf
6:33 Ship 40’s Nosecone
6:50 Ship 41’s Nosecone
7:11 Ship 42’s Nosecone
7:20 Ship 45’s Nosecone
7:30 Likely Nosecone Work Platform
7:47 Ogive Fwd Vert Tooling
7:59 The Launch Site
8:09 OLM Disassembly Continues
8:37 Raptor Quick Disconnect
9:53 Booster Thrust Simulator
10:09 Ship 39 Moved to Ring Stand
10:39 OLM Leg Shielding Removed
10:53 Ship 39 Aft Rolled to MB2
LDAPAABJRG2UMCU3
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: