ICF Second Floor is Going On! Tying the basement ICF walls to the next story.
Автор: Lake Lot Build
Загружено: 2021-05-15
Просмотров: 36093
Описание:
Episode 15: The crew is back to begin setting ICF Fox Blocks for the first floor, which is actually the second floor of ICF. John explains how the first floor is tied into the basement walls, including addressing the “cold joint” that can form between concrete pours. Watch the crew set the rough openings in the ICF block for doors and our large 16-foot window. The blocking, stack joints, bracing, and Fox Blocks clips are all explained and featured in this episode.
Channel overview: John and Leslie take you step by step on the journey of building their new home on Table Rock Lake. The house is an ICF (insulated concrete form) home with suspended garage floor and concrete decks. This all takes place on a sloped lot, where the fun never ends. From septic tank to backfill headaches, join them on their journey to build a home on their dream lake lot on Table Rock Lake!
Contractors and suppliers in this episode:
Xypex Concrete Additive
Fox Blocks ICF Forms
Area Information:
Table Rock Lake Chamber of Commerce
https://www.visittablerocklake.com