Crested Butte - Teocalli Lift
Автор: Beyond the Lodge
Загружено: 2026-01-27
Просмотров: 66
Описание:
Teocalli Lift is a four-person fixed-grip chairlift located at Crested Butte Mountain Resort. The lift runs from just below the Paradise Warming Hut Lodge up to near the top of the Red Lady Express Lift. The chairlift primarily serves to connect condo developments to the rest of the mountain and a small pod of intermediate terrain. From the top of the lift, skiers may access the base area and both frontside and backside chairlifts. The lift was manufactured by Skytrac and installed at the resort in 2019, replacing a 1979 Riblet double chairlift of the same name.
Crested Butte Mountain Resort is a ski area located in Mt. Crested Butte, Colorado. The resort is located just northeast of the town of Crested Butte, a 40-minute drive north of Gunnison, and a 4-hour drive west of the Front Range cities of Denver and Colorado Springs. The resort is centered on the north side of Crested Butte Mountain and is known for its vast collection of extreme expert terrain, including hike-to terrain off the summit of the mountain and Rambo, the steepest tree-cut run in North America. In addition to its well-known expert terrain, Crested Butte also features a variety of terrain for all ability levels, the resort's frontside, which features advanced terrain on the upper half of the mountain and an extensive beginner area lower on the mountain, and the resort's backside, which features a large collection of intermediate terrain. The resort is owned by Vail Resorts, which purchased the mountain in 2018 from Triple Peaks, along with the company's other properties: Mount Sunapee in New Hampshire and Okemo Mountain Resort in Vermont. Crested Butte is included on Vail's Epic Pass, with unlimited access and no blackouts on both the full and local passes.
Manufacturer: Skytrac
Year of Installation: 2019
Vertical: 642 ft
Length: 3,791 ft
Estimated Time in Recording: 11:03
Estimated Speed in Recording: 343 ft/min
Design Speed: 450 ft/min
Capacity: 1,800 per hour
Filmed on January 15, 2026
Filmed on the GoPro Hero 9 Black with the Max Lens Mod attached
0:00 Loading
0:34 Ride Up
11:37 Unloading
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: