Penalty लगते ही action में GE - 20 F404 Engines for Tejas MK1a
Автор: Vnation 111
Загружено: 2026-04-04
Просмотров: 21409
Описание:
Penalty लगते ही action में GE - 20 F404 Engines for Tejas MK1a
Hindustan Aeronautics Limited (HAL) has confirmed that General Electric (GE Aerospace) will deliver 20 F404-IN20 engines in the second half of 2026, with the 6th engine already ready for delivery.
This is a crucial development for the HAL Tejas Mk1A program, which was facing delays due to engine shortages. Several aircraft were already built and even test-flown, but were waiting for engines.
With these upcoming deliveries:
• Tejas Mk1A production will accelerate
• Aircraft integration and testing will speed up
• Deliveries to the Indian Air Force are expected to begin soon
HAL and GE are also working to stabilize the supply chain, with future plans targeting 24 engines in FY 2026-27 and 30 engines annually from 2027-28 onwards.
This marks a turning point for India’s defense manufacturing and strengthens the vision of Aatmanirbhar Bharat in aerospace.
⸻
🎯 Topics Covered
• Tejas Mk1A engine delay explained
• GE F404 engine delivery update
• HAL production status
• Indian Air Force future fleet
⸻
🔔 Stay Connected
If you enjoy defense updates, don’t forget to Like, Share & Subscribe for more content on Indian military and global defense news!
⸻
#Vnation111 #indiandefenseupdates #indiandefensenews
#TejasMk1A #HAL #GEAerospace #IndianAirForce #DefenseNews #AatmanirbharBharat #F404Engine #IndiaDefense #FighterJet #MilitaryUpdate #Tejas #Aerospace #IndiaMilitary #DefenseUpdate #IndianAirForceNews
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: