Unit Costing and Batch Costing | Costing Ch. 8 | Jan 26/ May 26/ Sept 26
Автор: CA Krupen Y. Hathi
Загружено: 2025-12-30
Просмотров: 285
Описание:
Shot in Canon Camera - https://amzn.to/3L8wgBL
iPad - https://amzn.to/4qoCblH
iPencil - https://amzn.to/3KWwvQo
This video covers concepts of Unit Costing and Batch Costing including Economic Batch Quantity (EBQ) (Optimum Run/ Production/ Batch Size), Illustrations, Practical Questions and Case Scenario Based MCQs (RTP May-24 Que 7) from ICAI Module.
It is full Chapter 8 - Unit and Batch Costing of Paper 4 - Cost and Management Accounting for CA Inter. It is based on ICAI Study Material (Modules).
It is relevant for CA Inter May-2024 attempt onwards (Jan 26/ May 26/ Sept 26). It is relevant for ICAI New Scheme of Education and Training (New Course of CA Inter). It is helpful in understanding the concept and to remember as well.
Time Stamp
00:00 Introduction
05:36 Unit Costing (Including treatment of spoiled and defective work)
12:17 CA Inter Costing Chapter 8 Illustration 1
18:00 CA Inter Costing Chapter 8 Illustration 2
29:44 Batch Costing
35:14 CA Inter Costing Chapter 8 Illustration 3
40:16 CA Inter Costing Chapter 8 Illustration 4
51:03 CA Inter Costing Chapter 8 Practical Question 2
56:33 Economic Batch Quantity (EBQ) (Optimum Run/ Production/ Batch size)
01:07:37 CA Inter Costing Chapter 8 Illustration 5
01:09:00 CA Inter Costing Chapter 8 Illustration 6
01:13:03 CA Inter Costing Chapter 8 Illustration 7
01:26:01 CA Inter Costing Chapter 8 Practical Question 3
01:31:26 CA Inter Costing Chapter 8 Practical Question 4
01:35:35 CA Inter Costing Chapter 8 Practical Question 5
01:42:12 CA Inter Costing Chapter 8 Practical Question 1
01:53:00 CA Inter Costing Chapter 8 Case Scenario Based MCQs (RTP May-24 Question 7) (IMP)
Follow on:
Telegram Handle: @krupenhathi
Telegram Channel (For CA Inter): https://t.me/caintercakrupenhathi
Telegram Channel (For CA Final): https://t.me/cafinalcakrupenhathi
LinkedIn: / krupen-hathi-834772185
Instagram: https://instagram.com/krupenhathi?igs...
Twitter (X): https://twitter.com/KrupenH?t=dWtg8G_...
Facebook: / krupen.hathi
Contact: [email protected]
Case Scenario Based MCQs (RTP May-24 Que 7):
Arnav Ltd. operates in beverages industry where it manufactures soft-drink in three sizes of Large (3 litres), Medium (1.5 litres) and Small (600 ml) bottles. The products are processed in batches. The 5,000 litres capacity processing plant consumes electricity of 90 Kilowatts per hour and a batch takes 1 hour 45 minutes to complete. Only symmetric size of products can be processed at a time. The machine set-up takes 15 minutes to get ready for next batch processing. During the set-up power consumption is only 20%.
#caintercosting #unitcosting #batchcosting #costingillustration #costingquestions #costingtheory #cakrupenhathi
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: