Offshore Jacket Installation Animation | Offshore Animation
Автор: International Energy Club | Offshore Animation
Загружено: 2022-08-13
Просмотров: 4348
Описание:
Installing offshore jackets, which are steel structures supporting platforms or other facilities in offshore environments, involves a series of complex operations. Here's an overview of the typical procedures involved:
1. Preparatory Phase:
Site Survey and Preparation: Conducting detailed surveys of the seabed to assess conditions and identify potential hazards. Preparing the installation site by clearing obstacles and ensuring a stable foundation.
Jacket Fabrication: Fabricating the offshore jacket structure onshore or at a fabrication yard. This involves welding together steel components to form the jacket's frame and outfitting it with necessary equipment and fixtures.
2.*Transportation to Site:*
Loadout and Transport: Loading the fabricated jacket onto a transportation vessel, such as a barge or heavy lift vessel. Transporting the jacket to the installation site using tugboats or specialized vessels.
3. Installation Operations:
Positioning and Pre-Installation Surveys: Using positioning systems such as GPS and acoustic transponders to accurately position the transportation vessel over the designated installation location. Conducting final surveys to ensure precise alignment.
Jacket Lowering: Gradually lowering the jacket structure into the water using hydraulic jacks or winches mounted on the transportation vessel. This process requires careful control to prevent damage to the jacket or the seabed.
Pile Driving: Driving the jacket's foundation piles into the seabed using hydraulic hammers or vibratory pile drivers. This secures the jacket in place and provides stability against environmental forces such as waves and currents.
Grouting and Welding: Grouting the connection between the jacket's legs and the foundation piles to enhance structural integrity and prevent corrosion. Welding additional components such as boat landings, access ladders, and utility platforms.
4. Post-Installation Phase:
Platform Installation: If the jacket serves as a support structure for an offshore platform, additional installation operations, such as topside module installation and integration, will be carried out following the jacket installation.
Testing and Commissioning: Conducting tests and inspections to verify the integrity and functionality of the installed jacket structure. This may include load testing, non-destructive testing, and functional testing of equipment.
Handover and Operations: Handing over the completed installation to the client or operator for commencement of offshore operations. This may involve training personnel and providing documentation on the installed structure.
Importance of Animation
The International Energy Club, recognized as the best offshore animation studio globally, has developed numerous animations illustrating the construction and installation of offshore jackets. These animations provide detailed visualizations of the various stages of the installation process, enhancing understanding and safety awareness among industry professionals. Through its expertise in animation and commitment to excellence, the International Energy Club delivers invaluable resources for companies involved in offshore construction, enabling them to visualize, plan, and execute jacket installation operations with precision and confidence.
About International Energy Club
International Energy Club is a world-renowned offshore animation studio known for its commitment to excellence and innovation in visual storytelling. With a diverse portfolio spanning various genres and mediums, the studio continues to captivate audiences worldwide with its captivating animations. To know more about us & our capabilities in the field of offshore, marine & subsea animations, you can visit our website.
http://www.internationalenergyclub.com/
🔔 Don’t forget to like, comment, and subscribe to our channel for more animations showcasing the latest innovations in offshore, marine, and subsea industries!
#OffshoreAnimation #offshorewind #3danimation #offshore #animationvideo #offshoreplatform #oilplatform #subsea #energy #offshoreanimation #vessel #SubseaTechnology #trainingvideo #marinetechnology #InternationalEnergyClub #oilandgas #oilrig #rigmove #offshoredrilling #animation #drillingrig #oilwell #berthing #Shipberthing #fender #marinefender #safetyanimation #offshoreJacket #heavylift #installationvideo #heavyliftvessel #loadout #jacketinstallation