ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

Landslide Damages Upper Tamakoshi Hydropower Project's Dam Structures

Автор: ICT Frame

Загружено: 2024-09-28

Просмотров: 3444

Описание: 28 September 2024, Kathmandu

Continuous heavy rainfall triggered a landslide, causing significant damage to the structures of the 456 MW Upper Tamakoshi Hydropower Project, located in Lamabagar, Bigu Rural Municipality-1, Dolakha. The landslide has impacted the headworks area of the project, leading to a halt in electricity production as of Friday evening at 7 PM.

Due to the rising water flow in the Tamakoshi River, the dam’s floodgates have been fully opened to manage the increased pressure. The landslide has severely damaged critical infrastructure, including the control room, the desander (a settling basin that removes sand from the water), and the culvert that channels water from the dam to the desander.

CEO of Upper Tamakoshi Hydropower Limited, Mohan Gautam, mentioned that the access road from the powerhouse in Gongar to the dam has been blocked due to flooding in nearby streams, preventing personnel from reaching the site. Based on the severity of the landslide, it is presumed that the control room, desander, and culvert have sustained substantial damage. Additionally, large quantities of stones and mud have accumulated in the reservoir area.

Efforts are underway to rescue two employees trapped inside the control room, though no human casualties have been reported so far. The Nepalese Army, Nepal Police, and Armed Police Force have been mobilized for rescue operations in coordination with the Dolakha District Administration Office.

The design discharge capacity of the Tamakoshi Project is 66 cubic meters per second (cumecs). As of Friday afternoon, the water flow at the dam site reached 461 cumecs, far exceeding the threshold of 250 cumecs, which mandates a shutdown of the powerhouse as per the power purchase agreement with the Nepal Electricity Authority. The project halted electricity production entirely at 7 PM due to the continuing rise in water flow.

#UpperTamakoshiHydropower #ictframe
#NepalHydropower
#LandslideDamage
#HydropowerProject
#TamakoshiRiver
#DisasterManagement
#NepalElectricity
#InfrastructureDamage
#Dolakha
#HydropowerShutdown
#FloodRescue
#WaterFlowCrisis
#NaturalDisaster
#RescueOperations
#HeavyRainfall
#NepalEnergy
#PowerOutage
#DamSafety
#NepaleseArmy
#EnvironmentalImpact

ICT Frame is an online magazine for the community belonging to information and communication technology which also provides two versions of magazine based on native and international language. It has its headquarters in Nepal situated at New Baneshwor, Kathmandu. ICT Frame serves the need of today's world which is occupied mostly with the ideas relating to information technology. It has been helping out Nepalese youths providing different perspectives regarding the development of Information Technology in Nepal.
ICT Frame provides regular viewers with the current advancement in the IT field as well as the challenges the new generation might have to face. It has been providing several ideas regarding the prosperity of the IT field and introduced people with a topic for discussion regarding the field itself. ICT Frame provides a platform to those Nepalese youths who have a passion on IT and wants to optimize their skills in order to confront current issues in Nepal.
https://ictframe.com/about-us/

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
Landslide Damages Upper Tamakoshi Hydropower Project's Dam Structures

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]