深圳地鐵5號線延線體驗
Автор: Brian Ngan(World Railway production)
Загружено: 2026-01-29
Просмотров: 242
Описание:
深圳地鐵5號線延線體驗
這條路段於2019年開工,2025年12月28日通車, 由於要下穿繁忙地點,因此施工時間較長,
最初這線是終點站是大劇院,但因為施工困難和資金問題改以黃貝嶺終點,
由於黃貝嶺站不在市中心,需要轉乘2號線才可以前往,令這站的月台擠迫,因此重提延長至大劇院
分流2號線乘客,因此黃貝嶺至大劇院的路段基本上和2號線平行
This section was constructed in 2019 and became operational on Dec 28, 2025. Since there is a need to pass under a busy
location, the construction time will be longer.The terminal was originally Grand Theater, but was changed to Huangbeiling due to difficult
construction and lack of funds. Since Huangbeiling Station is not in the city center, passengers must transfer to Line 2 to get there,
causing the platforms to become overcrowded. Therefore, the proposal to extend the line to Grand Theater has been raised again
to divert passengers from Line 2.Therefore, the section from Huangbeiling to Grand Theater is basically parallel to Line 2
0:00 片頭(Opening)
0:15 黃貝嶺-湖貝(Huangbeiling To Hubei)
2:01 湖貝站往大劇院方向開出(Hubei Station Towards Grand Theater Train depart)
2:45 湖貝站往赤灣方向開出(Hubei Station Towards Chiwan depart)
3:18 湖貝站大堂(HuBei Station concourse)
3:52 湖貝站月台(HuBei Station platform)
4:46 現在路段是湖貝至東門(This section is Hu Bei To Dong Men)
6:16 東門站往大劇院方向開出(Towards Grand Theater Train depart)
6:59 東門站月台(DongMen Station platform)
7:32 往赤灣方向開出(Towards Chiwan depart)
8:12 東門站大堂(DongMen Station concourse)
9:40 現在路段是東門至大劇院(This section is DongMen To Grand Theater)
12:39 大劇院開出往掉頭側線(Depart Grand Theater and Towards Turn Back Siding)
13:29 大劇院站大堂(Grand Theater station concourse)
15:18 大劇院站往赤灣列車開出(Grand Theater station Towards chiwan Train Depart)
16:49 片尾(Closing)