Goodsyard Revamp - Testing New Trackwork (Part 1A)
Автор: Station Road Model Railway
Загружено: 2022-09-12
Просмотров: 4714
Описание:
As a continuation of Part 1 of the Goddsyard Revamp series, I finalise wiring for the track power and point motor control, and perform some running tests with locomotives and rolling stock to ensure smooth operation.
Information on railway cattle docks in the UK:
http://igg.org.uk/rail/7-fops/fo-catt...
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: