MSTC Refresher 108: Volume of Fill in Earthworks
Автор: Engr. Harf Miranda (Sir Harf Engineering Tutorial)
Загружено: 2024-11-05
Просмотров: 2559
Описание:
Earthwork quantities for a section of roadway indicate a transition from fill to cut. The following areas are scaled from the print cross sections.
Station (m)
Cut Area (m2)
Fill Area (m2)
20+00
-
173.21
20+10.50
-
43.56
20+21.50
14.32
9.63
20+28.50
64.73
-
20+40
187.42
-
The total volume (m3) of fill required for this section of road is most nearly:
A. 1430
C. 1730
B. 1450
D. 1780
Thanks for watching!
Comment for questions and suggestions for future lecture in this series.
Subscribe and hit the bell button to be notified for future posts.
#civilengineering #boardexam #engineering #CivilEngineeringLicensureExamination #PRC #MSTE #MSTC #cele #geometry #calculus #algebra #trigonometry #solidgeometry #engineeringmathematics #engineeringeconomics #surveying #statistics #dataanalysis #probability #physics #refresher #MSTCRefresher #SHET
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: