Wet Well Assembly | Mt. Solo | Caisson Construction
Автор: Romtec Utilities
Загружено: 2021-12-23
Просмотров: 1442
Описание:
Romtec Utilities goes through a series of steps in each wet well assembly to ensure a water tight seal and longevity of the wet well in waste water environments. Prefabricated concrete wet wells arrive on-site in sections ready to be assembled and installed. Romtec Utilities, with the use of barrel gaskets, sealant, and tape coat, has perfected the technique of sealing joint-to-joint connections with each wet well section.
The story and history of Romtec Utilities is that of a company who specializes in the design and supply of the best, most practical, most affordable, and most sophisticated site specific pumping systems available worldwide. We have completed hundreds of projects across the United States and have supplied packages for international installations. Contact us for assistance. We love to talk about pumping systems of every type, shape, and size!
Contact Romtec Utilities for your pump station design and supply at (541) 469-9678 or email [email protected]
Learn more at https://romtecutilities.com/
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: