Big pole little hole wild fast N deep.
Автор: Eric Curtis
Загружено: 2026-01-18
Просмотров: 1213
Описание:
Installing 40 ft long pilings that are 14” diameter with only 10 ft of water. Pre drilled through rock and clay the previous day. So near 20 ft into the ground from a barge. The 30 ft tall jet pipe the crane hoist up and down are pumping large amounts of water to flush residual sand, rock and clay from the holes prior to installing the very large pilings. The jack up barge is very helpful for large work like this that other barges of the same side won’t touch this kind of work.