Export Cable Pull in at the Burbo Bank Offshore Windfarm Extension
Автор: Aerial Pixel Ltd
Загружено: 2016-06-21
Просмотров: 16006
Описание:
A short video to show the export cable pull in at the Burbo Bank Offshore Windfarm extension. There were some considerable engineering challenges to enable the team to get the cable installed safely.
The cable was floated ashore on pillow floats to a small jack up barge then pulled through the tidal and connected to a winch for the final 760 metre pull through a HDD that had been installed 12 months ago.
A great achievement for all involved!