R1300 Valve Service
Автор: Boxflyer
Загружено: 2025-10-21
Просмотров: 2165
Описание:
This is the 1st time I've done the Valve Clearance Service on the R1300.
Cam Timing is not really covered here, I'm still researching the proper procedure.
I will repost/revise this video after I get the Cam Chain Tensioner and learn more about the procedure for doing the Cam Timing on the 1300.
Tools used in this Video
TDC Locking Pin 83305A99425
Valve Adjusting Tool 83305B301B5
Cam Alignment Jig 83305B34A23
Barring Tool 83302327808
Consumables
Spark Plugs NGK LMAR8AI-10
TDC Plug Crush Washer 16x20mm AL
Cam Chain Tensioner O-Ring 17x3mm
Valve Cover Gasket Set LH 11121027893
RH 11121027894
Boxflyer R1300 Torque Sheet Ver. 1.2
https://drive.google.com/file/d/16TrE...
Boxflyer Blank Cam Timing / Valve Clearance Worksheet
https://drive.google.com/file/d/1D3ur...
Contents of this Video
0:00 Intro
0:20 Bars/Covers/Panel removal
1:30 Coil wire notes
2:20 Spark plug/coil removal
2:45 Valve cover removal
3:20 Valve cover gasket note
4:15 Cam chain notes
5:45 Camshaft notes
6:50 Timing reluctor notes
7:30 Spark plug info
9:10 TDC plug
9:30 TDC locking pin install
10:20 Rotating engine for TDC LH side
12:05 Cam alignment jig
13:20 LH valve clearance check
14:40 Cam base circle info
14:55 LH INT clearances
16:05 LH EXH clearances
17:05 LH shim removal tool
17:50 Fuel injector note
18:30 LH shim removal
21:50 Alt view of LH shim removal
23:20 Shim measurement for replacement
24:05 Worksheet procedure
26:10 LH shim install
29:20 LH shim placement check
30:35 LH clearance recheck
32:35 Streak marks on cam lobes note
33:20 Fuel injector install
34:10 Crankshaft rotation for RH TDC
36:10 RH cam alignment jig
37:00 RH INT clearance
38:00 RH EXH clearance
38:55 RH shim removal
40:55 RH Worksheet procedure
42:05 RH shim install
48:15 RH clearance recheck
49:20 RH parts reinstall info
49:50 TDC locking pin removal
50:30 Conclusion
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: