Interior Selective Demolition Takeoff in Bluebeam Revu Full Project 15,000 Sq Ft Office Renovation
Автор: Chad Meyer
Загружено: 2025-04-28
Просмотров: 917
Описание:
In this detailed walkthrough, we perform a full interior selective demolition takeoff on a 15,000 sq ft office renovation project using Bluebeam Revu.
You'll learn how to measure and quantify removals for:
🧱 Drywall partitions
🚪 Doors and frames
🪟 Aluminum framed glazing assemblies
🛁 Bathroom fixtures and ceramic tile
🧱 Drywall ceilings
🧊 Acoustical ceiling tile and grid
🪞 VCT and carpet tile flooring
This is ideal for estimators, project managers, or contractors looking to improve accuracy and speed in demolition takeoffs. Along the way, we show practical tools and tips in Bluebeam Revu to streamline your workflow.
Chapters:
00:00 – 00:56 Intro
00:57 – 01:04 Set the Scale
01:09 – 03:58 Remove Drywall Partition Markups with Polylength Tool
04:00 = 05:00 Remove Existing Doors and Frames Markup with Count Tool
05:01 – 06:56 Remove Existing Aluminum Glazing with Length Tool
06:58– 07:35 Remove Existing Casework with Length Measurement Tool
07:36 – 08:54 Removal of Bathroom Finishes with Length, Count Area Tools
08:56 – 09:36 Removal of Elevator Lobby Floor and Ceilings with Area Tool
09:37 – 10:55 Removal of Acoustical Ceiling tile and Grid with Area Tool
10:56 = 11:41 Removal of VCT Floor finish with Area Tool
11:43 – 13:00 Removal of Carpet Tile Floor Finish with Area Tool
13:00 – 13:15 Export Markups to Excel CSV File
13:15 – 13:35 Adjust CSV data for clear format
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: