ycliper

Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
Скачать

SAL: MV Svenja, Installing Gas Platform

sal

transport

shipping

heavy lift

onboard cranes

Type 183

Heavy lift shipping

sea transportation

project service

Heavy-lift Ship

project service deliveries

heavy cargo

DP1

Dynamic positioning

Alaska

Kitchen Lights Unit

Offshore installation

Project Platform

Offshore project

Автор: SAL

Загружено: 2016-02-29

Просмотров: 7151

Описание: MV Svenja successfully finalizes her commitment at the KLU Project

Alaska derives its wealth from its crude oil and natural gas deposits, and most of them are located in the Cook Inlet. Exploitation started in early 1960s, but there is still a strong potential for development.

In March 2015 MV Svenja was chartered for the installation of the development platform within the Kitchen Lights Unit #3, a petroleum exploitation area of Deutsche Oel & Gas AG. Covering 337 square kilometers, this is the largest development region in the Cook Inlet.

The development platform consists of three main parts: The Monopod, a 45 m high steel base which, ultimately, will bear the load of the whole construction. It is stabilized by the King Pile, which works as a central pole, driven into the seabed. The other two main parts are the Topside and the Helideck.

For this scope of work MV Svenja required an extensive and technically challenging and time-constrained mobilization in Singapore. Extra living quarters were needed for the 60 supporting team members necessary to complete the project working and living on board for almost five months.

Because of the extremely strong surface sea currents at the installation site, a special mooring arrangement was designed for the vessel which comprised of ten pre-installed anchors strategically located on the seabed. The shipboard component of this arrangement comprised 10 winches and wires which were connected to the pre-laid arrangement. This configuration provided
safe and secure mooring along with precise positioning of the vessel despite the strong tidal currents.

Once the MV Svenja was secured within the mooring pattern, the first job was to drive the King Pile to the required depth. This was achieved with the use of a large hydro hammer. The King Pile not only holds the Monopod securely on the seabed but it also acts as a guide ensuring exact positioning of the Monopod.

With the King Pile in place, the Monopod was transported to MV Svenja by a barge and then lifted onto her deck for additional preparations. Subsequently the two 1000 t cranes of MV Svenja lowered the Monopod, which weighs 1100 t, accurately down to the seabed. Once the Monopod was landed and the cranes freed,
eight additional piles were driven through guides on the Monopod securing it to the seabed.

In early August the Topside, measuring 33 × 30 × 27 metres, was
installed onto the Monopod with a 700 tons single hook lift. “The Topside installation was an extremely tight lift with very small tolerances. It could only be carried out during high tide with an installation window of about four hours”, explained Captain Rüdiger Bauer. “For this reason, careful planning and exact execution was necessary for a successful installation”, he went on. Within two hours including the lift from the barge, the Topside was placed on the Monopod.

This step was followed by the installation of the Helideck measuring 16 × 15 × 6 metres and weighing 40 tons. Although this part of the installation was carried out by a rather simple lift, it still demanded proper planning due to the lifting height and the placement of the center of gravity. The installation went as per schedule. Both SAL and its client Crowley were absolutely satisfied with the course of the installation. “SAL was our primary heavy lift contractor for a highly technical and environmentally challenging installation of an offshore platform over a subsea gas well conductor. SAL’s technical skills, their vessel MV Svenja and the team’s operational experience led to a very successful installation”, states Michael Johnson, Statement Project Manager of Crowley.

Completing the installation of the Helideck and Topside, an essential milestone towards the completion of the infrastructure in the Kitchen Lights Unit #3 has been reached. From end of 2015 on, the first natural gas shall be produced from the Kitchen Lights Unit.

Holger Krenz, responsible Project Manager at SAL Heavy Lift, also expresses his great satisfaction with the project: “SAL is very pleased to have been chosen to undertake the highly technical and complex installation of the offshore platform for our client Crowley. In this project SAL has been able to make excellent use of its specialist knowledge and capabilities to the advantage of our client, Crowley, with the result that a safe and successful project was delivered.”
MV Svenja has returned for demobilization – ready for the
next challenge.

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
SAL: MV Svenja, Installing Gas Platform

Поделиться в:

Доступные форматы для скачивания:

Скачать видео

  • Информация по загрузке:

Скачать аудио

Похожие видео

Крупнейшая морская нефтедобывающая платформа в России // Анатомия Монстров

Крупнейшая морская нефтедобывающая платформа в России // Анатомия Монстров

SAL: MV Svenja transports 80 monopiles and 80 transition pieces in 20 journeys

SAL: MV Svenja transports 80 monopiles and 80 transition pieces in 20 journeys

SAL: MV Trina   XXL hammer on the hook

SAL: MV Trina XXL hammer on the hook

МиГ-29. Проблемы фронтового истребителя

МиГ-29. Проблемы фронтового истребителя

SAL: MV Anna loads fishing boat in Rijeka

SAL: MV Anna loads fishing boat in Rijeka

Отшельники Урала. 700 км по реке к деревням без электричества, дорог и связи

Отшельники Урала. 700 км по реке к деревням без электричества, дорог и связи

SAL: MV Svenja, transshipment of transition pieces to installation vessel

SAL: MV Svenja, transshipment of transition pieces to installation vessel

Фильм Алексея Семихатова «ГРАВИТАЦИЯ»

Фильм Алексея Семихатова «ГРАВИТАЦИЯ»

The Juniper Story - BPTT

The Juniper Story - BPTT

Как очищают воду из канализации?

Как очищают воду из канализации?

ЦЕНА ОШИБКИ: 13 Инженерных Катастроф, Которые Потрясли Мир!

ЦЕНА ОШИБКИ: 13 Инженерных Катастроф, Которые Потрясли Мир!

JSI Alliance completes scope in Basrah Refinery Upgrading Project

JSI Alliance completes scope in Basrah Refinery Upgrading Project

SAL: MV Frauke, loading yachts in Italy

SAL: MV Frauke, loading yachts in Italy

США и Израиль против Ирана: сколько продлится война? | Подкаст «Что это было?»

США и Израиль против Ирана: сколько продлится война? | Подкаст «Что это было?»

Почему некоторые дороги сделаны из пенопласта

Почему некоторые дороги сделаны из пенопласта

20 Фактов о Boeing 747, Которые Вас Удивят

20 Фактов о Boeing 747, Которые Вас Удивят

Парадокс ригеля и стропил

Парадокс ригеля и стропил

Почему железным дорогам не нужны деформационные швы

Почему железным дорогам не нужны деформационные швы

Эти мегапроекты заброшены и превратились в груду отходов, и никто не знает, когда они будут завер...

Эти мегапроекты заброшены и превратились в груду отходов, и никто не знает, когда они будут завер...

Музыка для работы - Deep Focus Mix для программирования, кодирования

Музыка для работы - Deep Focus Mix для программирования, кодирования

© 2025 ycliper. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]