Cotswold Canals Trust - New Bridge Across Stroudwater and Thames Severn Canals
Автор: Cotswold Canals Updates
Загружено: 2025-05-29
Просмотров: 596
Описание:
🚧 Temporary Bridge Safely Installed over Stroudwater Canal | CCT Project Update 🚧
This video captures the safe installation of a temporary vehicle bridge over the Stroudwater Canal—a vital step in enabling continued access during ongoing restoration works near Stroud.
Filmed using a AIR 3S DJI drone to offer a unique overhead perspective, the video shows the entire operation from above.
Installed using crane lifts and coordinated on-site work, this non-permanent bridge allows pedestrian and vehicle crossing without damaging the towpath, canal structure and for mudhoppers to pass through unimpeded so they can carry on dredging. The installation was carried out with precision and safety as top priorities.
🛠️ What You’ll See:
Full installation process from crane lift to bridge placement
Careful handling to protect the surrounding canal environment
Real-time footage of temporary infrastructure in action
A closer look at practical engineering on the Stroud Water Navigation.
This is part of the wider Cotswold Canals Connected effort to restore navigation through the Stroud district, reconnecting the historic waterway.
📆 Installed: May 2025
👷 Installation delivered in collaboration with Beaver Bridges, with coordination by the Cotswold Canals Trust.
🌐 Learn more about the project at: https://cotswoldcanals.org/
💡 Volunteer with us! Join: https://www.teamconnect.org.uk/regist...
🔔 Subscribe for more updates on our canal restoration projects and infrastructure works.
📍 Filmed on-site near Bonds Mill Estate
#StroudwaterCanal #CotswoldCanalsTrust #CotswoldCanalsConnected #TemporaryBridge #BridgeInstallation #CanalRestoration #EngineeringInAction #DroneFootage #StroudInfrastructure #CCTProjects #Stroud #Cotswolds #CotswoldEngineering #GloucestershireProjects
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: