Table of Contents:
1. 00:06 - 00:12 - Introduction
2. 00:13 - 00:19 - Table of contents
3. 00:20 - 00:36 – Shipping and packaging methods of the air handling unit
4. 00:37 - 00:52 – Checking the completeness of the delivery with the order
5. 00:53 - 01:02 – Unpacking and presentation of the ordered air handling unit
6. 01:03 - 01:11 – Tools needed to assemble the air handling unit
7. 01:12 - 01:36 – Downloading technical documentation
8. 01:37 - 01:51 – Positioning the main section in it’s final location
9. 01:52 - 02:21 – Connecting optional modules with the main section
10. 02:22 - 02:26 – Connecting the fire alarm
11. 02:27 - 02:41 – Connecting the supply air temperature sensor
12. 02:42 - 02:58 – Connection of the antifreeze thermostat of the water re-heater
13. 02:59 - 03:08 – Installation of the heating medium return temperature sensor on the medium outlet connector
14. 03:09 - 03:21 – Connection of the heating medium return temperature sensor
15. 03:22 - 03:48 – Connecting the signal controlling the control valve of the water re-heater
16. 03:49 - 04:26 – Connection of the alarm signal and 0-10V control signal of DxH cooler/heater supply unit
17. 04:27 - 04:38 – Connection of the signal for switching the HEATING/COOLING mode of the unit supplying the DxH cooler/heater and the START/STOP signal
18. 04:39 - 05:01 – Connecting the control of the HMI Basic operator panel
19. 05:02 - 05:05 – Completion of connection of controls components
20. 05:06 - 05:56 – Connecting the power cable for the water re-heater
21. 05:57 - 06:13 – Connecting the main unit power cable
22. 06:14 – Connecting to the power mains
23. 06:15 - 06:36 – Checking the correctness of the voltage between the phases of the main switch.
24. 06:37 - 08:16 – Commissioning the AHU using the physical HMI Advanced
25. 08:17 - 09:27 - Commissioning the AHU using the mHMI application
26. 09:28 - 13:24 - Commissioning the AHU using the built-in visualisation
27. 13:25 - 17:20 - Commissioning the AHU using the virtual HMI Advanced controller (WEB HMI)