GRADING a DITCH & prep for SOUND PROOF WALL
Автор: Dirty Diggers
Загружено: 2021-06-07
Просмотров: 637
Описание: in this video we use our kubota svl 75 track skidsteer along with a caterpillar 440 brand new backhoe to dig out between the posts of the sound barrier wall. Once excavated we lay down filter fabric, then add about 12"-18"n of clear stone, fold the fabric over the stone and then add another 3"-4" of stone. Once that was complete we graded all along the ditch side of the wall attempting not to get stuck at the bottom of the ditch! It was very soft and we buried the dozer earlier in thee week in it. We managed to get all the topsoil graded out nicely and ready for hydro seed installation.