Redding School of the Arts: Expanding a Creative Campus with Modular Speed
Автор: US-Offsite
Загружено: 2025-10-30
Просмотров: 26
Описание:
When Redding School of the Arts’ new high school program began to grow faster than expected, the team faced an urgent challenge — expand quickly without sacrificing quality or design.
US Offsite partnered with RSA to design, manufacture, and deliver five new modular buildings that met California’s snow-load standards and doubled classroom capacity — all in under 10 months.
This fast-tracked project created bright, inspiring spaces where students and teachers can thrive.
By integrating design, factory production, and on-site management, US Offsite ensured clarity, coordination, and cost savings every step of the way.
Project Highlights:
• 5 buildings, 10 modular units
• Capacity doubled from 100 to 200+ students
• Set July 9 → Students in class August 26
• 20% cost savings through proximity, design efficiency, and a shortened timeline
• Delivered under 10 months from design contract to occupancy
“The US Offsite team was easy to work with, communicative, and solution-oriented from start to finish.”
— Lane Carlson, Executive Director, Redding School of the Arts
👉 Download the full case study at www.usoffsite.com/RSA
Повторяем попытку...
Доступные форматы для скачивания:
Скачать видео
-
Информация по загрузке: